Technical Toolboxes Inc.
Home | Contact Us | Login | Downloads |    

  PRODUCTS   CONSULTING   TRAINING   DOCUMENTS   SUPPORT   NEWS   ABOUT US  
Products

Pipeline Toolbox
API Inspectors Toolbox
HDD Toolbox
Petroleum Toolbox
Drilling Toolbox - Special Edition
Salt Cavern Gas Storage Toolbox
Process Hydraulics Toolbox
RSTRENG
PRCI Thermal Analysis Model
for Hot-Tap Welding
PRCI's Submarine On-Bottom Stability software
PRCI's AC Predictive and Mitigation Techniques
IntelliCAD 6 by Autodsys


Horizontal Directional Drilling Toolbox

Professional Edition – Version 2.0

Applications Description Reference, Standard and/or Document Source
1. Drilling Fluids Hydraulics & Management in HDD

1.1 Analysis of Drilling Fluids Quantity Requirements in HDD

A.G.A/PRCI Report, PR-227-9321 (L51725)

1.2. Frictional Pressure Losses and Mud Pump Requirements

API RP 13D, Fifth Edition, June 2006

1.3.Pump Output (Duplex/Triplex)

Baroid Drilling Fluids Handbook

1.4. Maximum Allowable Mud Pressure

US Army Corp of Engineers “Technical Report CPAR-GL-98-1”, Final Report, Appendix B, April 1998

1.5. Minimum Allowable Mud Pressure

Aritartnam et al, “Predicting and Controlling Hydraulic Fracturing During Horizontal Directional Drilling”, American Society of Civil Engineers

1.6. Cuttings Transport and Slip Velocity Analysis

API 13D Recommended Practice, Fifth Edition, 2006
Larsen et. al: “Development of New Cutting Transport Model for High Angle Well including Horizontal Wells” SPE 25872

1.7. API Method for Determining Drilled Solids System Performance

API Method 1999
Baroid Drilling Fluids Handbook

1.8. Mud Weight Decrease Calculations

1.8.1 Volume Increase Tolerated

1.8.2 Final Volume Specified

Baroid Drilling Fluids Handbook

1.9. Mud Weight Up Calculations

1.9.1 Volume Increase Tolerated

1.9.2 Final Volume Specified

Baroid Drilling Fluids Handbook
2. Installation of Steel Pipe by Horizontal Directional Drilling

2.1 Pull Force and Installation Stresses Detail Analysis

A.G.A/PRCI Report, PR-227-9424 (L51730)

2.2. Post Installation & Operational Stresses: Steel Pipeline Crossings Highway
(Gas & Liquid Pipelines)

API RP 1102, Seventh Edition, December 2007
GRI Report 92/0202, PC-PISCES

2.3. Post Installation & Operational Stresses: Steel Pipeline Crossings Railroad
(Gas & Liquid Pipelines)

API RP 1102, Seventh Edition, December 2007
GRI Report 92/0202, PC-PISCES

2.4. Operational Stresses: Other Crossings

A.G.A/PRCI Report, PR-227-9424 (L51730)
3. Installation of Plastic Pipe by Horizontal Directional Drilling

3.1 Pull Force and Installation Stresses Detail Analysis (Pipe Deflection, Unconstrained Collapse, Hydrokinetic Pressure, Tensile Stress,...)

ASTM/ANSI F 1962 – 99
“Handbook of PE Pipe”, Plastic Pipe Institute, 2009

3.2. Allowable Tensile Load for Polyethylene Gas Pipe during Pull-In Installation

ASTM/ANSI F 1804 – 03

3.3. Post Installation & Operational Stresses – PE Pipe:

3.3.1 Road/Highway Crossings

3.3.2 Railroad Crossings

3.3.3 River Crossings

ASTM/ANSI F 1962 – 99
“Handbook of PE Pipe”, Plastic Pipe Institute, 2009
4. Installation of Cable in Conduit (CIC) by HDD

4.1 Pulling Loads and Frictional Forces Analysis

Maximum Safe Pulling Lengths for Solid Dielectric Insulated Cables, 2 Volume Cable User’s Guide, Electric Power Institute
“Handbook of PE Pipe”, Plastic Pipe Institute, 2009
5. Integrated Databases
5.1 Steel Pipe Database API 5L and ASTM/ANSI B36.10
5.2. PE Pipe Database ASTM/ANSI D2513
5.3. Mechanical Properties of Soils USCE EM 1110-1-1904
6. Utilities
6.1. Document Management System
6.2. Application Management System

Note: All mathematical methods and procedure are well documented in the online Help context sensitive system.

Back...